Axel Meschgbiz
Angestellt, Projektmanager, RWE Technology
Essen, Deutschland
Werdegang
Berufserfahrung von Axel Meschgbiz
Bis heute
Projektmanager
RWE Technology
3 Jahre und 8 Monate, Nov. 2005 - Juni 2009
Advisor / Project Manager
RWE Power AG
• Feasibility studies for largeand small scale coal power plants with CHP • Planning, erecting a high performance FGD Plant “REAplus” • Senior Expert for the furnace of coal and biomass fired plants. • Retrofit measures at a biomass fired CHP plant in Berlin Treptow • IGCC-CCS Project (concept study for a 450 MWe) • feasibility studies for a 1.1 GWe pre-dried lignite unit with CCS
3 Jahre und 8 Monate, Apr. 2002 - Nov. 2005
Project Manager
RWE Fuel Cells GmbH
• Project Management for the MTU 250 KWe MCFC at the RWE Pavilion in Essen • Preparing international projects together with City of Cologne • Project with Hungarian Consortium concerning heat and power supply for a residential and industrial area in Budapest • Preparing several EU Applications with the objective of demonstrating CHP Fuel Cells systems for residential and industrial applications • Negotiating and preparing contracts, Agreements in German and English language for different projects.
2 Jahre und 5 Monate, Nov. 1999 - März 2002
Project Manager
RWE Power AG
• Demonstrating a pressurised 300 kWe SOFC Plant (Siemens Westinghouse), combined with a microgas turbine at the RWE Meteorite site in Essen (Partners: Siemens Westinghouse, ENEL, Thyssengas, Budget: 15 Mio. €). • Planning, installing and operating a 100 KWe Siemens Westinghouse SOFC at the RWE Pavilion in Essen • Strategic budgeting and reporting for all demonstration and technical projects. • Negotiating and preparing contracts, Agreements in German and English language
5 Jahre, Nov. 1994 - Okt. 1999
Research Engineer
RWE Energie AG
• Investigation of combustion behaviour, fouling and slagging of pulverised pre-dried lignite under different furnace conditions. • Testing ultra sonic measurement system to determine coal mass flow and particle distribution at coal fired power stations. • Investigation in co-combustion of biomass and Lignite in a PF and CFBC plant. • Responsible for controlling, strategic budgeting and reporting of the R&D cost centre
5 Jahre und 5 Monate, Juni 1989 - Okt. 1994
Research Engineer
RWE Energie AG
Supervising the planning, preparing test programme, operating and reporting of PF pilot plant. Aimed at problem solving and testing new technologies related to coal combustion in large scale plants. • Simulation of gas turbines in combination with brown coal combustion • Modelling of Pilot Scale Test Facility • Investigation into the combustion, emission and fouling/slagging behaviour of different coals ranks • Research into the Formation and Destruction of N-Species at PF and CFBC Facilities
Ausbildung von Axel Meschgbiz
Verfahrenstechnik
Universität Karlsruhe
Energietechnik, Kraftwerkstechnik,
Sprachen
Deutsch
Muttersprache
Englisch
Fließend
Türkisch
Grundlagen
Farsi Muttersprache
-